h
 

HOME

m
  PROJECTS
t
  MANUFACTURING
t
  CONTACT US
| Member's Email Login |
Hemisphere Techology Limited
We execute to ISO 9001:2000, BS, ASME, ASTM, DIN, API, JIS and other International Standards.
We are not responsible for the accuracy of the resulting translation.
side

The Web Hemisphere

  • 2006  Lafarge-Nigeria, Shagamu Plant : No 1 Kiln Girth Gear Change
  • 2007   Lafarge-Nigeria, Shagamu Plant : No 1 Kiln Section Change
                           
  • 2007  Ashaka Cement: No 1 Raw Mill Girth Gear Change
                          
  • 2008   Lafarge-Nigeria, Shagamu Plant : Phoenix Project US$ 2.2 million
    Replacement of 7 numbers of kiln shell sections  4.55mtrs diameter, 6.6 meters long
  • Replacement of Cooler outlet shell along with 2 nos cooler tubes and 10 elbows-transition pieces.
  • Replacement of Kiln main drive girth gear along with spring plates, pins, super bolts, torsion shaft
  • Replacement of both barring drives.
                        
.2008   Ashaka Cement: Kiln Girth Gear Change
.2009    Lafarge-Nigeria, Shagamu Plant: Removal and installation of new clinker bucket conveyor. (Aumund)
tHOME t PROJECTS tMANUFACTURING t CONTACT US
© 2013 Hemisphere Technology Limited. All Rights Reserved.